电方面的一般都挺贵的。你看看下面的报价。
Labor and Material | Exposed | Concealed | Double Socket | 50 | 100 | Single Socket | 40 | 80 | SCV Socket | 80 | 160 | Telephone Socket | 35 | 70 | Heater Point | 80 | 160 | Aircon Point | 80 | 160 | Lighting Point & Install | 35 | 70 | Ceiling Fan Point & Install | 70 | 140 | Cooker Hood Point | 35 | 70 | Isolator 20 Amp | 140 | 280 | Speaker Cable Point | 35 | 70 | Pendent Light & Install | 35 | 70 | Connection Water Heater | 20 | 40 | D/B Box | 300 | - | 2 Way Switch | 60 | 120 | Oven Heater Switch | 70 | 140 | Computer Cable | 70 | 140 | Change double, Single, Heater, Aircon Socket | 20 | 40 | Change SCV Socket | 30 | 60 | Change Tel, 1 Gang, 2 Gang, 3 Gang | 15 | 30 | Change 4 Gang, 5 Gang | 25 | 50 | Dimmer Switch | 30 | 60 | | | | Labor only
| Exposed | Concealed | (If more than 3 meter considered as new installation) | | | Terminate & Test one power/lighting point | 15 | 30 | Change Switch | 8 | - | Install Light | 8 | 8 | Ceiling Light & Install | 30 | 60 | Shift Double, Single, Heater, Aircon Socket | 25 | 50 | Shift SVC Socket
| 40 | 80 | Shift Tel, 1 Gang, 2 Gang, 3 Gang | 15 | 30 | shift 4 Gang, 5 Gang | 20 | 40 |
|
|